Rooks Roofing restores aging commercial metal roofs with the Mule-Hide 100% Silicone Roof Coating System. We seal every seam and fastener, lock down rust, and cover the whole roof in a seamless, reflective membrane, with manufacturer warranties up to 20 years and no disruption to your business.
Most metal roofs on warehouses, shops and plants don't fail all at once. They fail at the seams, the fasteners and the rust spots, while the panels themselves still have years left in them. A silicone restoration system fixes those weak points and puts a new waterproof surface over the entire roof, usually for a fraction of the cost of tearing it off. Rooks Roofing & Exteriors has served Northwest Georgia and North Alabama for more than 20 years. We inspect your roof, tell you honestly whether it's a coating candidate, and install the Mule-Hide system to the manufacturer's published specification so it qualifies for warranty.

A silicone restoration system fixes the weak points of a metal roof and protects the whole surface. Here's what it does for your building:
Every seam, side lap, fastener and penetration is sealed with silicone or Liqui-Flash before the roof is coated, so the most common leak points are covered twice.
Rusted areas are wire-brushed and encapsulated in Mule-Hide A-125, a zinc-rich primer that inhibits new rust, before any coating goes on.

New white Mule-Hide silicone reflects 89% of sunlight, with 90% thermal emittance and a Solar Reflectance Index of 113. A cooler roof means less load on your HVAC through a Georgia summer.
Your building stays open. There's no demolition, no open roof deck and no truckloads of old metal headed to the landfill.
.png)
Unlike many acrylic coatings, silicone is rated to resist periodic ponding, which matters on low-slope metal roofs and around gutters and valleys.

At the end of its life, a silicone roof can be cleaned and recoated instead of torn off, restarting the clock at a fraction of the cost.
We install the complete Mule-Hide metal-roof system, step by step, to the manufacturer's published specification. Your building stays open the whole time.
We walk the roof, measure it, and photograph every seam, penetration, drain and known leak. A moisture survey finds wet insulation that has to come out before coating.
We test the coating on your actual roof, at least one test per roof condition and about every 4,000 sq ft, and pull-test it after 48 hours. This confirms the system will bond before you commit.
We re-secure or replace loose and backed-out fasteners, fix open seams and damaged flashings, replace wet insulation and repair any rust-through. The roof has to be sound and watertight before it is coated.
Loose paint and scaly rust are wire-brushed off. The roof is washed with Mule-Hide 115 Cleaner, then rinsed with a 2,000 psi pressure washer until a wipe test comes back clean.
Every rusted area is fully encapsulated in Mule-Hide A-125, a zinc-rich primer that inhibits new rust, and seams are primed 4 inches on either side.
Each seam gets a 4-inch strip of silicone sealant or Liqui-Flash, about 40 mils thick, and every fastener is capped. Curbs, pipes, scuppers and drains are flashed, and valleys and waterways are reinforced with polyester fabric and extra coating.
We grid the roof into 10-by-10-foot squares and apply the coating at the rate your warranty requires, checking thickness with a wet-film gauge as we go. Then we walk the finished roof with you.
A coating restores a roof that is still structurally sound. It isn't a fix for a roof that has already failed, and we'll tell you which one you have. Small problem areas can often be repaired, then coated, and we back every recommendation with photos, a moisture survey and adhesion tests.

For a sound metal roof, restoration solves the same leaks and rust as a new roof for far less money and disruption.
| Silicone restoration | Full metal roof replacement | |
|---|---|---|
| Typical cost | A fraction of replacement | Highest upfront cost |
| Disruption | Building stays open; no tear-off | Roof opened in sections; noise and debris |
| Time on site | Days for most roofs | Weeks for most roofs |
| Waste | Old roof stays in place | Old panels and fasteners hauled off |
| Warranty | Mule-Hide 10, 15 or 20 years | Panel and finish warranties vary by manufacturer |
| End of life | Clean and recoat | Replace again |
We use Mule-Hide's complete metal-roof system, not just the topcoat. Mule-Hide only warrants a roof when every component in the system is theirs, so each product below is part of the job.
| Component | What it does |
|---|---|
| Mule-Hide 115 Cleaner | Biodegradable cleaner that removes dirt, chalk and oils so the coating bonds to bare, clean metal |
| A-125 Metal Roof Primer | Zinc-rich, high-solids primer that encapsulates existing rust and inhibits new rust |
| 100% Silicone Sealant / Seal-Fast Liqui-Flash | Seals seams, side laps, end laps, fasteners and penetrations before the roof is coated |
| Reinforced polyester fabric | Embedded in silicone at valleys, waterways and problem areas for extra strength |
| 100% Silicone Roof Coating | The topcoat: a single-component, moisture-cured silicone membrane over the whole roof |
| Walkway granules (optional) | Non-slip walkways to rooftop units for your HVAC techs |
About the coating: Mule-Hide 100% Silicone Roof Coating is about 92% solids by weight, contains no solvents, is under 50 g/L VOC, and meets ASTM D6694 for liquid-applied silicone roof coatings. It stretches 300% without tearing, so it moves with the metal as it heats and cools. In accelerated weathering tests (QUV, 5,000 hours) it showed no degradation. It carries a Class A flame spread rating and is CRRC-rated.
Colors: White (the most reflective), Gray, Tan, Santa Fe Tan and Black. Custom colors are available with a lead time.
Mule-Hide offers No Dollar Limit (NDL) system warranties on commercial buildings. They're issued only when the system is installed by a Mule-Hide warranty-eligible contractor, registered with Mule-Hide before work starts, and completed to Mule-Hide's satisfaction.
| Warranty | Silicone topcoat applied | Seams and fasteners |
|---|---|---|
| 10-year NDL system | 1.5 gal per 100 sq ft (22 dry mils) | Silicone sealant or Liqui-Flash |
| 15-year NDL system | 1.5 gal per 100 sq ft (22 dry mils) | Liqui-Flash |
| 20-year NDL system | 2.0 gal per 100 sq ft (29 dry mils) | Liqui-Flash |
An NDL system warranty covers leaks caused by manufacturing defects, premature weathering and the installer's workmanship. Like every coating warranty, it does not cover leaks from movement or deterioration of the original roof underneath, or the coating's appearance and staining. Ask us for a sample warranty and we'll walk you through it.
Every quote is written after an inspection, because these factors move the price more than square footage alone:
Silicone cures with moisture from the air, so it handles Georgia humidity well, and it's tack-free in about 1 to 2 hours. We apply it when it's 40°F and rising, the roof surface is between 35°F and 100°F, and there's no rain or heavy dew in the forecast. In practice that means most of the year here, with winter jobs scheduled around warm, dry stretches.
We shut off and seal rooftop air intakes while we work and protect parked cars, walls and equipment from overspray, so your tenants and staff can carry on as normal.
Warehouses and distribution centers, manufacturing and industrial plants, shops and pre-engineered metal buildings, retail and strip centers, churches and fellowship halls, schools and gyms, agricultural and equipment buildings, and offices with low-slope metal roofs.
A roof-mounted fan came apart and tore through its aluminum housing. Our crew installed fiberglass patches over the damaged metal, sealed every seam and penetration, and finished with white Mule-Hide 100% Silicone Roof Coating for a seamless, reflective, watertight surface.
See the projectA coated roof needs very little, but a few habits protect your warranty: have it inspected twice a year and after major storms, keep drains, gutters and scuppers clear, and keep foot traffic to the walkways. Rooks offers commercial maintenance plans that cover all of it.
Commercial roof maintenanceMule-Hide system warranties run 10, 15 or 20 years depending on how much coating is applied. When it nears the end of its life, the roof can be cleaned and recoated rather than replaced.
Yes, when the leaks are at seams, fasteners, laps or penetrations, which is where most metal roofs leak. We seal each of those points before coating the whole roof. If a panel is rusted through, we repair it first.
Surface rust, yes. We wire-brush it, clean it and fully encapsulate it in Mule-Hide's zinc-rich A-125 primer. Rust that has gone through the panel has to be repaired first.
No. There's no tear-off, and the work happens on the roof. We shut off and seal rooftop air intakes while coating so fumes don't get inside.
White silicone reflects 89% of sunlight when new, which keeps the roof surface and the space under it cooler. Savings depend on your insulation, HVAC and how the building is used.
Silicone resists ponding water and holds up to UV without breaking down, so it suits low-slope metal roofs where water can sit at laps and gutters.
We don't coat before forecast rain. Silicone is tack-free in about 1 to 2 hours, and moisture in the air actually helps it cure.
Yes. Mule-Hide silicone comes in White, Gray, Tan, Santa Fe Tan and Black, with custom colors on request. White saves the most energy.
From Cartersville, Rome and Marietta to Gadsden, Huntsville and Guntersville, Rooks Roofing restores commercial metal roofs with the Mule-Hide silicone system. Call or request a free assessment, and we'll tell you honestly whether coating is right for your roof.